Paralleling
Line Drop Compensation (LDC)
|
|
App Tip #2
(617 KB)
LDC For Substation Application
This Application Tip describes the differences in the R & X LDC
(line drop compensation) method and the LDC-Z method. The tip includes
detailed setting calculation methods and discusses application considerations
for method choice. |
Backup
Autodaptive®
Special Application

Sales and Service
For sales and service information
contact your local representative
or contact the factory:
E-mail: sales@beckwithelectric.com
Call (727) 544-2326
or Fax (727) 546-0121
|
 |


 |
Note: Documents are provided in Adobe
Acrobat PDF format and require Acrobat
5.0 or higher to view.
|
|