High speed transfer of auxiliary services at a generating plant or the
motor load in an industrial plant is highly desirable to prevent either
damage to critical motors or an unplanned shutdown.
A significant induced voltage will remain at the terminals of a rotating
machine for a period of time following removal of power. If, during the
power transfer sequence, the phase angle of this voltage relative to the
auxiliary source is ignored, severe damage to an expensive machine or
process may result. The M-0245C High Speed Sync-Check Relay provides the
means necessary to inhibit transfer if the phase angle is excessive or
the line voltage is out of range.